التالي


Floor & Caulk Removal (Seq 10) | Buying a Catamaran – Sequence of Events

12 المشاهدات· 09/26/22
SV Sequence
SV Sequence
68 مشتركين
68

⁣The second weekend of boat work and repairs!
With a lot of nudging, we were allowed to remove caulk, prep work, and clean areas of the boat. They began caulking and removed half of the salon floor/sole, as it was incredibly rotten.

أظهر المزيد

 0 تعليقات ترتيب حسب